Modulus

Heavylift & Transport Consulting

The study comes before the lift.

Feasibility, lift studies, and transport consulting before anything is picked up. We treat complex cargo as a calculation — route, plan, and erection in one brief.

The Problem

The problem is not the weight. It's the guesswork.

A quote instead of a study

Heavylift fails when the first document is a rate, not a feasibility. Tonnage without a plan is still guesswork.

Lift method decided too late

Crane class, rigging, and tandem lifts belong in the consulting stage — not when the cargo is already on the quay.

Transport split from the lift

Road, barge, and installation are one move. Consulting that ignores any leg will break at the interface.

No owner of the calculation

Forwarders coordinate. We consult, then engineer. One team holds the study through to erection.

The Solution

01

Heavylift studies before a booking

02

Transport consulting across land and sea

03

Feasibility for move and erection

04

Lift planning as part of the same brief

How Heavylift & Transport Consulting works

Heavylift studies

Mass, CG, lift points, and method statements drawn before a hook is chosen.

Transport consulting

Route, conveyance, and constraints modelled as one plan from origin to site.

Feasibility studies

Cargo, route, plan, and site as a single calculation — including erection at destination.

Lift planning

Rigging, crane selection, and tandem cases specified so the lift is engineered, not improvised.

How we work

A 200-tonne transformer, calculated before the lift

Heavylift fails when the cargo is treated as a booking. We start with stress points, stability curves, and a packing design that can survive open water — then we execute against that blueprint.

Heavylift module on a barge at sea
“Where others see tonnage, we see a blueprint. The move is designed before a crate is lifted.”

OOG

Out-of-gauge cargo engineered, not forced into a box

4

Disciplines under one standard of precision

Talk to Our Engineering Team

Disciplines

Four disciplines. One standard of precision. Every engagement starts with engineering, not logistics guesswork.

The Physics Behind Every Voyage

Before a single crate is lifted, our marine engineers calculate stress points, stability curves, and load paths. It's the invisible math that keeps a 200-tonne transformer sitting still in open water.

OOG

Out-of-gauge cargo

ODC

Over-dimensional loads

Learn more

Request a feasibility study. We'll be in touch same day.

Tell us about the cargo, the route, and the constraints. We start with engineering, not a booking note.

  • — Feasibility study
  • — Marine & naval architecture review
  • — Packing and trading scope

Trusted across the GCC for OOG and ODC cargo movement.