Road and sea as two jobs
If the trailer plan does not talk to the barge plan, the cargo pays at the interface.
Land & Sea Transportation
Transportation and installation engineering for land and sea moves of complex cargo — route studies, conveyance, and set-down as a single calculation.
The Problem
If the trailer plan does not talk to the barge plan, the cargo pays at the interface.
Bridges, turning radii, air draft, and channel limits are engineering inputs — not a surprise on the day.
Erection and set-down are part of transportation, not a separate hope after arrival.
SPMT, barge, or heavy truck must fit the cargo, not the other way around.
The Solution
How Land & Sea Transportation works
Axle loads, permits, escorts, and path geometry for oversize moves on the road.
Barge, vessel, and stow planned against motions, draft, and the cargo envelope.
Survey of constraints on land and water so the plan is possible before it is promised.
How the cargo leaves the conveyance and meets the foundation — in the same brief.
How we work
Heavylift fails when the cargo is treated as a booking. We start with stress points, stability curves, and a packing design that can survive open water — then we execute against that blueprint.

“Where others see tonnage, we see a blueprint. The move is designed before a crate is lifted.”
OOG
Out-of-gauge cargo engineered, not forced into a box
4
Disciplines under one standard of precision
Disciplines
Before a single crate is lifted, our marine engineers calculate stress points, stability curves, and load paths. It's the invisible math that keeps a 200-tonne transformer sitting still in open water.
OOG
Out-of-gauge cargo
ODC
Over-dimensional loads

Tell us about the cargo, the route, and the constraints. We start with engineering, not a booking note.
Trusted across the GCC for OOG and ODC cargo movement.